01
Complete Bathroom Renovations
Manage the full transformation from initial strip-out through to completion.

G2 Brothers Construction
Thoughtfully built.
Beautifully finished.
From first-fix plumbing and room preparation through to tiling, installation and final detailing, we deliver complete bathroom renovations from start to finish.
Bathroom Renovations
A successful bathroom renovation depends on much more than the final fixtures.
Behind the finished room are plumbing, waterproofing, electrics, preparation, tiling and careful coordination between different trades.
G2 Brothers Construction manages the complete construction process to create bathrooms that are practical, durable and finished to a high standard.
Bathrooms Projects
Selected examples of our work.
Bathroom Services
01
Manage the full transformation from initial strip-out through to completion.
02
Prepare and install the water, waste and associated plumbing requirements for the new bathroom.
03
Careful preparation, waterproofing and tiling to create a durable finished space.
04
Install baths, showers, basins, toilets, furniture and associated fittings.
05
Coordinate bathroom lighting, extraction and electrical requirements where required.
06
Complete decorating, silicone, carpentry and final finishing works.
From Strip-Out to Finish
Bathroom projects involve several trades working in a relatively small space. We coordinate each stage so preparation, services, waterproofing and finishing happen in the right order.
The exact scope of works is agreed and detailed within your project quotation.
The Bathroom Process
01
Tell us about the existing bathroom and what you want to change.
02
We inspect the room, services and access and discuss the proposed layout.
03
We establish the required works and prepare a detailed quotation.
04
The bathroom specification, fittings and programme are confirmed before work begins.
05
The room is stripped out, prepared and rebuilt through the required plumbing, tiling and installation stages.
06
Final finishing works and checks are completed before handover.
Planning Your Bathroom
Bathroom projects work best when the layout, sanitaryware, finishes and technical requirements are established before construction begins.
We work from the agreed specification so plumbing positions, electrical requirements, tiling layouts and installation details can be coordinated properly.
Why G2
01
A clear point of responsibility throughout the project.
02
A clearly defined scope before work begins.
03
Attention to the work behind the finished bathroom.
04
Detail-focused installation and final presentation.
Bathroom Questions
Start a Conversation
Tell us about your existing room, what you want to change and the finish you have in mind.